We install vertical tanks of roll production and by the sheet method
We install pumps with subsequent tying of pipelines and shut-off valves
Steel pipes are used for the installation of pipelines for transporting the technological medium
It is an H-shaped structure made by welding three strips of steel for load-bearing structures
Rental of a mobile crane hourly and in shifts, load capacity 12.5 tons, boom reach 14 m
We produce products: ridge elements, eaves, gaskets, end elements, wind bars, etc.
Production of warehouse buildings with subsequent installation of sandwich panels and profile sheet
Escape stairs for industrial and public buildings, fire escapes, marching stairs, etc.